Skip to content
Subscribe

Concentrated solar power projects moving ahead in California

Published:

Two major concentrated solar power (CSP) projects in California received major funding from the Department of Energy last week while a third got a go-ahead after determining a plan to ensure that desert tortoises will not be threatened.

CSP reflects the heat of the sun to a small area where is it used to heat fluids or create steam which then powers turbines to generate electricity. Traditional CSP uses wet cooling, which means it gets a steady supply of fresh water. This procedure is cost-effective but obviously highly controversial, especially in deserts where water is scarce and the water wars are already fierce. Thus, many CSP projects are mandated to use dry-cooling which reuses water as much as possible and can cut water usage up to 90%.

The Mojave Solar Project and the Genesis Solar Project received a total of $1.9 billion in loan guarantees last week from the Department of Energy. These projects, when completed, will generate 250 MW each.  The Mojave Solar Project got $1.2 billion in guarantees. It uses the heat of the sun only and does not have backup natural gas power.

The Genesis Solar Project near Blythe received $681 million in guarantees.  While originally wet-cooling, it has apparently switched to dry-cooling and will use 202 acre feet a year (enough for 550 homes) from onsite wells which, since the water might be from Colorado River aquifers, is the subject of a lawsuit.

The Ivanpah Project near Primm NV got $1.6 billion in guarantees awhile back and just received permission from the Bureau of Land Management to continue after the project was halted due to finding far more desert tortoises than expected.  The new plan for tortoise mitigation requires them to buy additional land for relocation, monitoring them for five years, and more. At times, they have over 100 biologists onsite monitoring the tortoises and it has cost them a "surprising amount of money." Ivanpah will generate 392 MW when finished and uses dry-cooling.

CSP in deserts takes large amounts of land. Between them, these three projects will use 12 square miles. However, this is probably smaller than land use by hydropower or coal, when you factor in the size of the reservoir behind the dam or land destroyed by mining coal. As always, water is a key issue. For CSP to be successful in California, it needs to use as little water as possible. What we are seeing now in the Mojave is just the beginning. If these CSP plants are economically successful (and how can they not be with California mandating 33% renewable energy use by 2020?), then many more will follow. What the long-term effect on the Mojave or water supplies will be if, say, dozens of CSP plants are sited there is not known.

The combined power output, when completed, of all approved big solar projects in deserts in California now (including the three mentioned here), is 4192 MW or about 4.2 GW.  That's about the size of one big nuclear plant or two big coal plants. On a nice June day, California uses about 702,000 MWh with renewable energy generation being about 13% of that. We have a long ways to go and a short time to get to that 33% goal.

Adhere to the IVN etiquette

By posting a comment, you agree to adhere to our etiquette rules: No partisan attacks, no personal attacks, substantiate your sources, no self-promotion.

Contact IVN

Questions about this article or our coverage? Send us a message. A free IVN member account is required.

Message sent

Thanks, we’ll review it and get back to you if needed.

Message not sent

Sorry, something went wrong. Please try again.

Sign in to send a message

Messages are tied to your IVN member account. Signing in is free and takes a few seconds.

Contact IVN

Questions about this article or our coverage? Send us a message. A free IVN member account is required.

Message sent

Thanks, we’ll review it and get back to you if needed.

Message not sent

Sorry, something went wrong. Please try again.

Sign in to send a message

Messages are tied to your IVN member account. Signing in is free and takes a few seconds.

Republish this article

Republishing guidelines

Republish IVN articles for free. Independent Voter News articles may be republished online or in print under a Creative Commons BY-NC-ND 4.0 license, on these terms:

  1. Credit the author and IVN. Keep the byline ("By Author Name, Independent Voter News") and the attribution note at the end, which links to the original.
  2. Keep the meaning. You may update time and place references and apply your house style. You may trim for length, as long as the cuts don't change the meaning or misrepresent the author. Keep the headline. Mark any additions as your own (for example "Additional reporting by ...").
  3. Translations are welcome. Translate faithfully, add "Translated from English by [your outlet]", and tell us at editor@ivn.us.
  4. Keep the links, including the link to the original article.
  5. Keep the tracking image. The HTML includes a 1-pixel image that counts readers on your page. It collects no personal information.
  6. Photos and illustrations. Images credited to IVN may be used with this article only. Images credited to others (AP, Getty, Unsplash, Wikimedia and so on) stay under their owners' terms. Secure the rights or switch "Include images" off.
  7. Don't sell it. You can't sell our articles or sell ads specifically against them. Your normal site advertising is fine.
  8. No implied endorsement. Don't suggest that IVN or the author endorses you, your candidates or your causes, or that donations to you support IVN.
  9. Keep labels. Opinion or analysis pieces keep that label.
  10. Point search engines to the original. Where your CMS allows, set the canonical URL to the original IVN article.
  11. No bulk or automated republishing, and don't submit our articles to aggregators (Apple News, Google News, MSN) as your own.
  12. Corrections and removals. Update your copy when we correct it, and remove it promptly if we ask. We'll contact you at the email you give us.
  13. Questions or print republication: editor@ivn.us.

IVN staff: fill in who you're inviting above, then create the invite.

Preparing the article

Concentrated solar power projects moving ahead in California

Choose a format
  • HTML
  • Email HTML
  • Markdown
  • Formatted (.docx)
  • Plain text
  • WordPress blocks
  • PDF
Choose a platform

Photos credited to others need their owners' permission.

To for

Republishing somewhere else? Questions? editor@ivn.us